Piping
Engineering service for
CPCMTD LPG odorant system of Shen-Ao oil receiving terminal
engineering work.
CPCMTD revamping service
for LPG odorant system of Shen-Ao oil receiving terminal
construction work.
CPCMTD revamping service
Keelung harbors No.33 engineering work.
CPCMTD Keelung No.33
harbors pumping station engineering work.
CPCMTD oil gas storage &
transportation revamping facilities.
Piping engineering design
Chi-lung tank farm blending system.
CPCMTD oil transfer tine
for Pa-Tu tank farm to Pa-Tu loading station engineering work.
Kaohsiung tank farm lube
oil loading & unloading system project.
Stress analysis & support
design for No.3 TA/PTA plant of China American Petrochemical Co.,
Ltd.
LNG transportation 26
inches pipeline from Miaoshu to Hsinchu project.
The project of Keelung
River Ta-Hua Bridge to Tsung-Tzi bridge pipeline movement
engineering work.
The project of increase LNG
transportation 8 inches pipeline from Yuan-Li to Jih-Nan.
The project of increase LNG
transportation 8 inches pipeline from Tai-An River to Tai-Chia Road.
The project of Tai-Chia
river crosses three 12” petroleum pipeline lowers engineering work.
The project of Wu-Chi
Bridge of 921 earthquake calamities crosses pipeline engineering
work.
Shen-Ao oil receiving
terminal LPG pipeline to Chang project.
The project of Wu-Chi
bridge 8” pipeline hanging system.
The petroleum pipeline
construction work in Chi-Lung mountain project.
The project of movement 12”
petroleum pipeline in Tai-An river.
No. 28 Land oil pipeline
remove project engineering work.
The project of increase 12
inches petroleum pipeline from His-Tzu to Shi-Men tank farm.
The project of pipeline
protection for Keelung river engineering work.
Engineering service for
Sung-San airport pipeline revamping project.
Engineering service for
Sung-San airport pipeline revamping project.
San-Ao harbor station LPG
unloading arm changing project.
The project of Tai-Chia
river crosses one 8” petroleum pipeline lowers engineering work.
The project of Tai-An river
remove 26” LPG pipeline.
The CPC Shin-Men oil tank
farm 92, 95 unleaded gas loading pump improve project.
92 unleaded gas loading
pipeline project design work.
Services of regional
pipeline planning and design for north of peach factory.
Fragmentary project design
work of the pipeline and oil plant for Kaohsiung. |